---
title: "Outdoor Classrooms and Timber Shelters for Schools | Craft Wales"
url: https://craft-wales.co.uk/sectors/schools
description: "Bespoke timber outdoor classrooms, shelters, play equipment and seating for schools across Wales, designed, made and installed by our own team."
lang: en
---

Image: Timber barn shelter with a red tiled roof and solid timber sides, on grass beside a school building (https://craft-wales.co.uk/__l5e/assets-v1/533452e8-b703-47d6-8c3e-371202a1b4b8/barn-at-school.jpg)

[ Schools and education ]

# Somewhere for the children to go when it _rains._

The hardest part of outdoor learning in Wales is rarely the curriculum or the children. It is the weather. We design, make and install timber outdoor classrooms, shelters, play equipment and seating that keep your grounds usable through the year, all made in our own factory in Ystrad Mynach and installed by our own team.

Making since 2006 Fourteen schools on our past work list Design, manufacture and install in‑house Installed by the people who made it Five year workmanship guarantee

[ What it changes ]

## A wet Tuesday in February stops being a _problem._

### Wet break stays outside.

When the rain comes in, break no longer collapses into the hall and the corridors. The children get outside, and the staff get their lunch hour back.

### Lessons carry on outdoors.

A covered space means a lesson planned for outside actually happens outside, instead of being moved back in at the first drizzle. Over a school year that is the difference between outdoor learning being a plan and outdoor learning being a habit.

### Somewhere they want to be.

A storytelling chair or a play ship becomes the thing the children run to at break and the thing parents notice on open evening. It stops being equipment and starts being part of the school.

[ Outdoor learning in Wales ]

## Made in Wales, by people from _Wales_

The Curriculum for Wales treats being outdoors as equal to the indoor classroom, and outdoor learning as a central way of teaching rather than an occasional treat. The idea of cynefin runs through it too, the sense of place that comes from knowing where you are from and who made what is around you.

Everything we build is made by our own team in Ystrad Mynach, from our own factory, and installed by the same people who made it. When a school asks where their outdoor classroom came from, the answer is a workshop in Ystrad Mynach, not a catalogue. We also make a Welsh-language range of learning panels and shapes for Welsh-medium and bilingual schools.

[ What we build for schools ]

## Built for the way a school day _actually runs._

### Outdoor classrooms

A whole class can keep working through a downpour, with the lesson carrying on under cover.

### Shelters and canopies

Somewhere for a year group to sit, eat or shelter when the weather turns.

### Stages and performance areas

Raised timber staging for assemblies, performances and sports day.

### Play equipment

A play boat and a climbing frame with a slide, set on safety surfacing.

### Benches and picnic tables

Round picnic tables that seat eight, for eating outside or working in groups.

### Learning panels and shapes

Including our Welsh-language range, for Welsh-medium and bilingual schools, in hard-wearing two-colour Play-Tec plastic.

### Story corners and outdoor seating

A storytelling chair, a curved bench and timber stumps, arranged so a group can sit together.

### School names and badges

A round plaque with the school name and motto carved into timber, made to the school's own design.

### Garden entrances and planters

A carved entrance into the school garden, with planters at the posts.

### Decorative gates

Gates with designs cut through them, made to the school's own artwork.

### Fencing and partitions

Coloured picket fencing and panels lettered with the class name, marking out one class's own part of the playground.

### Storytelling thrones

A tall timber chair for story time, with the school's own words carved into the backrest.

More about our outdoor classrooms (https://craft-wales.co.uk/what-we-build/outdoor-classrooms)

[ Metal fabrication ]

## One contractor for the timber and _the metal_

We have our own metal fabrication and welding shop, so the metalwork that goes with a timber job is made by the same team in the same building. There is no subcontractor and no waiting on someone else's schedule. If you have something in mind that mixes the two, tell us and we will come and look at it.

Book a Site Visit (https://craft-wales.co.uk/contact)

[ The coloured parts ]

## What the _colourful_ parts are made of.

The bright panels, shapes, carved logos and signs you see on our shelters and play equipment are made in Play-Tec, a two-colour plastic sheet designed for outdoor use.

It does not rot, splinter or need painting, the colour runs through the sheet rather than sitting on the surface, and it stands up to daily use in all weathers. Schools often ask for it by name.

[ Featured product ]

## The _Barn_

A fully waterproof timber shelter, designed to make outdoor space useful in every season.

Sized for a full class, so a whole year group can sit down together and nobody is left standing in the rain.

- 5m by 4m or 6m by 4m as standard, other sizes available on request
- Seats 30 to 35
- Galvanised steel posts concreted into the ground so the legs never rot
- Finished in Welsh oil
- From £7,800

Ask us for a quote: https://craft-wales.co.uk/contact

Enquire About The Barn (https://craft-wales.co.uk/contact)

[ Working in your school ]

## Safe hands on a _live site._

Letting a team of joiners into a working school is a decision you have to be comfortable with. Here is what you need to know before you say yes.

### Public liability insurance

£5 million, with Chiswell Insurance.

### DBS checked installers

Yes. Our installers are DBS checked.

### Installing around the school year

Holidays are usually our busiest time, and we can work during term time where it is safe to do so. Smaller items in stock can be a matter of days; larger items take around a week to make and a week to install.

### Risk assessments and method statements

Available on request.

### The site is cordoned off

Fenced off for the whole installation, so nobody can get into the work area

### Guarantee on our work

Five year workmanship guarantee

[ Recent school projects ]

## School Barns, built for _schools._

01

### Bro Banw Infants, Carmarthenshire

A Barn, plus a dragonfly bench and a set of our benches adapted to act as drain covers, which solved a problem on site for the school.

02

### Bro Banw Junior, Carmarthenshire

A Barn, and their second from us. The first was installed several years earlier.

03

### Ysgol Rhydaman, Carmarthenshire

A Barn, the last of the four installed that summer.

04

### Ysgol Bro Preseli, Pembrokeshire

A Barn shelter and a matching bike store made and installed for Ysgol Bro Preseli in Pembrokeshire.

[ Schools we have worked with ]

## Schools _across Wales._

Schools and nurseries

- Hendre Primary School
- Darran Park Primary
- Cwm Ifor
- Cwm Gwyddon
- Cwm Derwen
- Our Lady and St Michael's Catholic Primary
- Maes Y Morfa
- Ysgol Y Felin
- Ysgol Penalltau
- Hendredenny Primary
- Ty Sign Primary
- Pontllanfraith Primary
- Ysgol Bro Preseli
- Little Einsteins Academy
- Hendre Primary School
- Darran Park Primary
- Cwm Ifor
- Cwm Gwyddon
- Cwm Derwen
- Our Lady and St Michael's Catholic Primary
- Maes Y Morfa
- Ysgol Y Felin
- Ysgol Penalltau
- Hendredenny Primary
- Ty Sign Primary
- Pontllanfraith Primary
- Ysgol Bro Preseli
- Little Einsteins Academy

Projects completed for these organisations.

What schools say

> “The craftsmanship of these structures is of an extremely high standard.”

Hendre Primary School

Miss C. Joynson, Headteacher

[ How we work ]

## From first visit to final fitting.

1. 01
   ### Free Site Visit
   We come to you, measure up and talk through what you need.
2. 02
   ### Design and Quote
   We draw it up by hand, to scale, and give you a fixed price.
3. 03
   ### Made in Our Workshop
   Built by our own team in Ystrad Mynach.
4. 04
   ### Installed by Our Team
   Delivered and fitted on site by the people who made it.
5. 05
   ### Aftercare
   We offer a full aftercare package to help your products last.

## Come and show us your _grounds._

Book a Site Visit: https://craft-wales.co.uk/contact

Try the concept tool: https://craft-wales.co.uk/concept-builder

Try the concept tool (https://craft-wales.co.uk/concept-builder)

## Structured data

```json
{
  "@context": "https://schema.org",
  "@type": "BreadcrumbList",
  "itemListElement": [
    {
      "@type": "ListItem",
      "position": 1,
      "name": "Home",
      "item": "https://craft-wales.co.uk/"
    },
    {
      "@type": "ListItem",
      "position": 2,
      "name": "Schools and education",
      "item": "https://craft-wales.co.uk/sectors/schools"
    }
  ]
}
```